A rail-guided mobile platform and cabin built over a pool used for water-treatment quality testing. The team handled the structure, fabrication and on-site installation.
At a glance
| Year | 2024 |
|---|---|
| Done by | |
| Field | Welded structure, Fabrication, Installation |
| Related service | Industrial parts manufacturing |
Have a similar project?
Send a description, drawings or photos. Quotes are free and usually ready within one to two weeks.
Contact
For design, fabrication or automation projects, use the form below or reach us directly. Quotes are free and usually ready within one to two weeks.
Other ways to reach us: